Agencies 12 Pin Military Connector
1. Product Introduction of mil spec circular connectors
The servo arm connector has a protective grounding electrode. When connecting, the protective grounding electrode is connected first, and then the current carrying electrode is connected. When separating, the current carrying electrode is disconnected before the protective grounding electrode;
The socket size of the connector is exactly the same as that of the p-type plug;
The connector can prevent dust and splash;
The plug and socket of the connector are provided with protective covers to prevent dust and liquid from entering after the plug and socket are separated.
2. Product Specification of milspec connectors


| Number of Contact | 12Pins(Other contact please contact us) |
| Material of Contact | Copper(Gold/Silver-plated) |
| Diameter of Contact | 1.5mm |
| Connector Hole Diameter | 28mm |
| Shell Material | Nylon, Plastic |
| Rated Current | 10A |
| Connector Type | Straight or Angled |
3. Payment & Express

4. Company Profile
Xiamen LEAKA Electrical Equipment Co., Ltd., invested and established in Xiamen in 2015, is a connector enterprise focusing on connector R & D, production and sales. It has 100 employees and covers an area of 3500 square meters.
With complete production equipment, testing equipment and sales management system, as well as an experienced R & D and production team, Xiamen LEAKA can provide customers with cost-effective products and connector solutions. Our main products include servo drive connector, watertight connectors, wiring terminals, circular connectors, heavy-duty plugs, connector harnesses and their accessories, which are widely used in industrial automation, industrial network transmission, automobile, security, food and pharmaceutical, printing and packaging, electronic manufacturing and other fields.
5. Our Advantages
All departments have conducted strict contract review to ensure the feasibility of each order.
Process design and verification before mass production.
Strictly control all raw and auxiliary materials, and all raw materials reach the world advanced level.
Conduct on-site inspection on all processes, and the inspection records can be traced back to 3 years.
100% inspection of finished products before shipment.
Advanced and complete testing equipment.
Regular training of inspectors.
6. FAQ
